What is REBLOC?

Barriers with a minimum design life of 50 years are mandated for permanent use in England on central reserves of roads with high traffic volumes.

The REBLOC concrete vehicle restraint systems (VRS) are precast products that allow for rapid deployment across the strategic road network.

The off-site manufacture also eliminates wet trades on site, reduces the risk to the workforce with shortened installation times and is immediately operational with no curing time required.

 

Ranging from normal containment to very high containment, our full suite of both permanent and temporary concrete VRS are tested to EN 1317 and are CE marked.

Our precast systems are the product of choice for main contractors as the requirement for off-site manufacture increases.

View our REBLOC Brochure

product overview

Product
Performance Criteria
Minimum Installation
Installation Detail
Performance Criteria
Minimum Installation LOW CARBON
Installation Detail
Performance Criteria H1W1
Minimum Installation 32m
Installation Detail Anchored asphalt
Performance Criteria
Minimum Installation NOISE BARRIER
Installation Detail
Performance Criteria H2W4
Minimum Installation 64m
Installation Detail Free standing
Performance Criteria H2W4
Minimum Installation 65m
Installation Detail Free standing
Performance Criteria
Minimum Installation VERY HIGH CONTAINMENT
Installation Detail
Performance Criteria H4aW1
Minimum Installation 44m
Installation Detail Anchored concrete
Performance Criteria H4bW2
Minimum Installation 32m
Installation Detail Anchored concrete
Performance Criteria H4aW4
Minimum Installation 88m
Installation Detail Free standing
Performance Criteria H4bW2
Minimum Installation 75m
Installation Detail Anchored concrete
Performance Criteria H4bW2
Minimum Installation 82.5m
Installation Detail Anchored soil
Performance Criteria H4bW4
Minimum Installation 96m
Installation Detail Free standing with securing anchor
Performance Criteria H4bW5
Minimum Installation 96m
Installation Detail Free standing
Performance Criteria H4bW5
Minimum Installation 96m
Installation Detail Free standing
Performance Criteria H4bW5
Minimum Installation 82.5m
Installation Detail Free standing
Performance Criteria H4bW6
Minimum Installation 104m
Installation Detail Free standing
Performance Criteria H4bW6
Minimum Installation 104m
Installation Detail Free standing
Performance Criteria H4bW6
Minimum Installation 104m
Installation Detail Free standing
Performance Criteria
Minimum Installation HIGH CONTAINMENT
Installation Detail
Performance Criteria H2W1
Minimum Installation 32m
Installation Detail Anchored asphalt
Performance Criteria H2W1
Minimum Installation 56m
Installation Detail Anchored concrete
Performance Criteria H2W1
Minimum Installation 32m
Installation Detail Free standing against a rigid wall
Performance Criteria H2W1
Minimum Installation 32m
Installation Detail Embedded in asphalt / concrete
Performance Criteria H2W1
Minimum Installation 40m
Installation Detail Embedded in asphalt / concrete
Performance Criteria H2W1
Minimum Installation 56m
Installation Detail Anchored concrete
Performance Criteria H2W2
Minimum Installation 56m
Installation Detail Pinned asphalt
Performance Criteria H2W2
Minimum Installation 56m
Installation Detail Anchored concrete
Performance Criteria H2W2
Minimum Installation 56m
Installation Detail Pinned asphalt
Performance Criteria H2W2
Minimum Installation 56m
Installation Detail Anchored concrete
Performance Criteria H2W2
Minimum Installation 64m
Installation Detail Pinned in compacted soil / concrete / asphalt
Performance Criteria H2W2
Minimum Installation 56m
Installation Detail Embedded in compacted soil
Performance Criteria H2W3
Minimum Installation 64m
Installation Detail Anchored soil
Performance Criteria H2W3
Minimum Installation 64m
Installation Detail Anchored soil
Performance Criteria H2W3
Minimum Installation 96m
Installation Detail Free standing
Performance Criteria H2W3
Minimum Installation 96m
Installation Detail Free standing with securing pin
Performance Criteria H2W4
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria H2W4
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria H2W4
Minimum Installation 96m
Installation Detail Free standing
Performance Criteria H2W5
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria H2W5
Minimum Installation 56m
Installation Detail Backfilled and embedded 50mm in asphalt
Performance Criteria H2W5
Minimum Installation 104m
Installation Detail Free standing
Performance Criteria H2W5
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria H2W5
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria H1W4
Minimum Installation 112M
Installation Detail Free standing
Performance Criteria H1W4
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria H1W5
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria
Minimum Installation NORMAL CONTAINMENT
Installation Detail
Performance Criteria N2W1
Minimum Installation 120m
Installation Detail Anchored asphalt
Performance Criteria N2W2
Minimum Installation 88m
Installation Detail Free standing
Performance Criteria N2W3
Minimum Installation 112m
Installation Detail Free standing
Performance Criteria N2W3
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria N2W3
Minimum Installation 112m
Installation Detail Free standing
Performance Criteria N2W3
Minimum Installation 108m
Installation Detail Free standing
Performance Criteria N2W3
Minimum Installation 112m
Installation Detail Free standing
Performance Criteria N2W3
Minimum Installation 80m
Installation Detail Free standing
Performance Criteria N2W4
Minimum Installation 120m
Installation Detail Free standing
Performance Criteria N2W4
Minimum Installation 68m
Installation Detail Free standing
Performance Criteria N2W4
Minimum Installation 92.7m
Installation Detail Free standing
Performance Criteria
Minimum Installation TRANSITIONAL ELEMENTS
Installation Detail
Performance Criteria N2W2
Minimum Installation n/a
Installation Detail n/a